Search results
- Significant events in the history of the Severn Valley Railway in preservation between 2010 and the present date ...h had been deferred at the time of the 2007 storm damage, and installation of the wheel-drop at Bridgnorth which required a 12,000 cubic foot hole to be108 KB (15,544 words) - 13:47, 12 April 2024
- |caption = June 2015, newly re-numbered D4100 |locono = D41006 KB (861 words) - 22:32, 11 March 2023