Timetable: Hartlebury and Kidderminster to Alveley and Tenbury 1964 (Freight only)

By 1964 passenger trains had ceased beyond the Kidderminster - Bewdley - Stourport triangle. Freight trains were still running as far as Alveley Colliery and Tenbury.
At the head of each column is the train's Reporting Number, the first digit of which indicates the train's classification, with '9' being an unfitted freight and '0' a light engine.
The letter in second position indicates the destination region, although in all cases here, the 'T' denotes a local trip train.
The third and fourth position digits are the unique identifying number for that train.

Contents

Timetable extracts

Down trains

Hartlebury to Alveley WTT 1964 page 116.jpg
Hartlebury to Alveley WTT 1964 page 117.jpg

Up trains

Hartlebury to Alveley WTT 1964 page 118.jpg
Hartlebury to Alveley WTT 1964 page 119.jpg

Time allowances for steam hauled freight trains

Hartlebury to Alveley WTT 1964 page 129.jpg

Speed of trains through junctions and other specified places

Hartlebury to Alveley WTT 1964 page 140.jpg