Difference between revisions of "Talk:Burlish Halt"

From SVR Wiki
Jump to: navigation, search
(Where did the halt go?)
(No difference)

Revision as of 19:54, 10 April 2021

This thread https://www.facebook.com/groups/2360466988/permalink/10158083300111989/?comment_id=10158084788096989&reply_comment_id=10158098499951989 on the SVRSevern Valley Railway Unofficial Facebook page has Richard Pearson saying " I did hear that the platform is now at Titley Junction " and Gerald Carter "Its true to say SVRSevern Valley Railway bought Burlish Halt but mainly for the platform that was made of prefabricated concrete sections. In those days it was a possibility that if the Bridgnorth bypass was built we would loose access to the station and so a run round loop would have been put on the Hampton Loade side of the bypass. By the time the bypass was built there were funds to pay for the bridge so the platform was not needed and was later sold to the Chasewater Railway . I can't find online info to support either.--Patrick Hearn (talk) 19:54, 10 April 2021 (UTC)"