Talk:Bridgnorth Station Footbridge
From SVR Wiki
Revision as of 22:25, 5 March 2021 by Patrick Hearn (talk | contribs) (Not moved to the boiler shop)
Station master Chris Thomas has emailed me: "One factual error - the footbridge wasn't sandblasted and painted in the boiler shop - it was taken off-site. Somewhere in the Black Country I think it was. All that remained were the eight support columns." Any record in SVRSevern Valley Railway News where it went?--Patrick Hearn (talk) 22:25, 5 March 2021 (UTC)