'''March 2020'''
:Specialist contractors removed asbestos from around the cylinder block of [[GWR Large Prairie 4150]].<ref>[http://www.4150.org.uk/news/4150_mar20.html 4150 Fund March 2020 restoration update] (Retrieved 2 April 2020)</ref> :A new pair of cylinder blocks for [[GWR 7802 Bradley Manor]] were poured, believed to be the first 7800 class cylinder blocks to be cast for 70 years.<ref>[https://www.erlestokemanorfund.co.uk/march-2020-update/ Erlestoke Manor Fund March 2020 update] (Retrieved 2 April 2020)</ref>:Brush Class 47 Co-Co 47773 [D1755] arrived at the SVR from Tyseley for contract bodywork repairs in the [[Diesel Depot]].:A severe acute respiratory syndrome, [[2020 coronavirus disease (COVID-19)pandemic|coronavirus disease (COVID-19)]], was declared a pandemic. It caused widespread disruption and international travel restrictions. On 18 March the SVR cancelled all services and closed [[The Engine House]] and refreshment rooms throughout March and April. It cancelled the following events: Easter Holidays, [[Spring Steam Gala]], [[Open House Weekend]], Spring Diesel Festival and 50th Anniversary Event. On 20 March it announced it would close the Railway's two pubs in line with a measure announced by the Government that day, and the shops followed on 24 March.:The combination of February's flooding, the continuing planned work at Falling Sands, coronavirus and land movements meant the SVR was faced with a serious financial challenge. On 20 March the Railway launched an Emergency Appeal for £250,000 to help the SVR through the emergency, which raised £50,000 in the first four days. '''April 2020''':By 2 April the emergency appeal total reached £120,000.:The Coronavirus pandemic lead to further total closures until the end of June and the cancellations of the 1940s weekends.:A minimal contract engineering presence saw tests on the [[Bridgnorth Loco Works#New_boiler_assembly_and_production|second of five new boilers for the Isle of Man Railway]].:On 15 April [[Ruston and Hornsby 165hp Diesel Shunter D2960|D2960 Silver Spoon]] took [[GWR 9055 Nondescript Saloon]] for a test after overhaul, running within the confines of the section signal at Kidderminster. The line to Bewdley remained severed for the winter works, interrupted by the COVID-19 pandemic.:The SVR reported an increase in trespassing during the closure.<ref>[https://www.shropshirestar.com/news/local-hubs/bridgnorth/2020/04/29/warning-to-trespassers-on-severn-valley-railway/ Shropshire Star 29 April 2020] (Retrieved 29 April 2020)</ref>:[[John Leftwich]], interim chairman of the [[Severn Valley Railway Charitable Trust Ltd|Charitable Trust]], died. :On 30 April the renamed Fighting Fund total passed £650,000. '''May 2020''':Phase 2 of the [[Falling Sands Viaduct]] work commenced on 18 May while the railway was closed to other traffic, involving replacing damaged brickwork and corbelling, and repointing throughout. :On 28 May 47593 and 47805 delivered nine HST trailers to Kidderminster from Crewe for storage, and moved one stored sleeper out.
==Steam locomotives used==
| style="text-align:right;" |
|
|-
| [[GWR 6960 Raveningham Hall|6960 Raveningham Hall]]
| style="text-align:right;" | X
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| On hire 2020
|-
| [[7714]]
|
|-
| [[GWR 6960 Raveningham Hall|6960 Raveningham HallWD 71516 Welsh Guardsman]] | style="text-align:right;" | X
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| style="text-align:right;" |
| On hire 2020
|-