Changes

Jump to: navigation, search

Severn Valley Railway Timeline 2020-2029

45 bytes added, 12:45, 1 March 2020
m
Link added
:The [[Bridgnorth#Footbridge_outside_Bridgnorth_Station|Footbridge outside Bridgnorth Station]] was closed for repairs to the damaged holding down bolts discovered in [[Severn Valley Railway Timeline 2010-2019#2018|2018]].
:Storm Dennis, with heavy rain falling on already saturated ground, contributed to record highs on the [[River Severn]] and consequent widespread flooding. The SVR was fortunately mostly unscathed, although access to the SVR was disrupted during half-term running from 15 to 23 February.
:On 25 February [[Other rolling stock visiting the SVR‎ |PPM50 Parry People Mover Class 999 No. 999900 ]] visited for testing. It was previously tested in [[Severn Valley Railway Timeline 2000-2009#2002|2002]].
:On 27 February [[WD 71516 Welsh Guardsman]] arrived at Bridgnorth.
Trustworthy, administrator
6,611
edits

Navigation menu