:The SVR announced a new [[Loyalty Pass]] to replace the Annual Family Pass, now available to individuals, couples, less-able visitors or families.
'''February 20212020''':The [[Bridgnorth#Footbridge_outside_Bridgnorth_Station|Footbridge outside Bridgnorth Station]] was closed for repairs to the damaged holding down bolts discovered in [[Severn Valley Railway Timeline 2010-2019#2018|2018]]. :Storm Dennis, with heavy rain falling on already saturated ground, contributed to record highs on the [[River Severn]] and consequent widespread flooding. The SVR was fortunately mostly unscathed, although access to the SVR was disrupted during half-term running from 15 to 23 February.
==Steam locomotives used==