Difference between revisions of "Severn Valley Railway Timeline 2020-2029"

From SVR Wiki
Jump to: navigation, search
(Page added)
 
(2020: info added)
Line 7: Line 7:
  
 
'''January 2020'''
 
'''January 2020'''
:x
+
:3 January was the 50th anniversary of the final regular timetabled BR passenger services between Bewdley and Hartlebury and Kidderminster.
 
 
  
 
==Steam locomotives used==
 
==Steam locomotives used==

Revision as of 14:04, 4 January 2020

Significant events in the history of the Severn Valley Railway in preservation between 2020 and the present date are set out below.

Information on current events on the SVRSevern Valley Railway can be found here.

2020

2020 saw the 50th anniversary of the official opening of the SVRSevern Valley Railway. A ‘must-do’ engineering project was starting, an overhaul of Falling Sands Viaduct, with trains restricted to the Bridgnorth to Bewdley section from 30 December 2019.

January 2020

3 January was the 50th anniversary of the final regular timetabled BRBritish Rail or British Railways passenger services between Bewdley and Hartlebury and Kidderminster.

Steam locomotives used

A table of steam locomotives used since 2020 is shown below. Where detailed mileage records were not published in SVRSevern Valley Railway News, locomotives used are marked 'X'. For locomotives hired in, the table identifies whether they were present either for the Summer (S) or Winter (W).

Locomotive 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Comment
813 X
1450 X
1501 X
2857 X
7714 X
7802 Bradley Manor
7812 Erlestoke Manor
34027 Taw Valley X
13268
43106 X
6960 Raveningham Hall X On hire 2020
Total

See also


References

SVRSevern Valley Railway News unless otherwise stated.