2010
'''January 2010'''
:New points were installed at [[Hampton Loade]] to replace those damaged in the derailment the previous autumn. Services from Kidderminster terminated at [[Highley]] while the work took place.
 
'''February 2010'''
:On 23 February the internal enquiry team's report into the previous year's [[Severn Valley Railway Timeline 2000-2009#2009|Hampton Loade derailment]] was presented to the [[SVR(H)]] Board. The recommendations were accepted in full. These included responsibility for safety residing solely with SVR(H) rather than the Joint Board, reviewing the SMS and insituting an audit procedure to ensure compliance<ref>SVR News 169</ref>.