Difference between revisions of "September 9"

From SVR Wiki
Jump to: navigation, search
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*[[The_Severn_Valley_Railway_under_GWR/BR_ownership#British_Railways_Western_Region:_1948-1982 | 1963]] Passenger services between Shrewsbury and Bewdley ceased.
+
*[[The_Severn_Valley_Railway_under_GWR/BR_ownership#British_Railways_Western_Region:_1948-1982 | 1963]] Passenger services between Shrewsbury and Bewdley ceased.<ref>[[Bibliography#Books|Smith (1968)]] p. 26.</ref>
*[[Severn Valley Railway Timeline 1970-1979#1979|1979]] [[2857]], the first Churchward 2-8-0 to be steamed in preservation, moved under her own power for the first time.
+
*1973 After several test steamings and checks, [[61994 The Great Marquess|LNER 3442 The Great Marquess]] worked Bridgnorth to Hampton Loade services for the first time since arrival and overhaul at the SVR.<ref>SVR News 29</ref>
*[[Severn Valley Railway Timeline 1990-1999#1994|1994]] [[LMR 600 Gordon]] was the first steam locomotive to use [[Kidderminster Turntable]].
+
*[[Severn Valley Railway Timeline 1970-1979#1979|1979]] [[2857]], the first Churchward 2-8-0 to be steamed in preservation, moved under her own power for the first time.<ref>SVR News 53</ref>
 +
*[[Severn Valley Railway Timeline 1990-1999#1994|1994]] [[LMR 600 Gordon]] was the first steam locomotive to use [[Kidderminster Turntable]]<ref>SVR News 112</ref>.
 +
 
 +
==Gallery==
 +
Photos taken on 9 September:
 +
<gallery>
 +
73129_20140910.jpg | 2014: 73129 at Bridgnorth
 +
</gallery>
  
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in September|September 09]]
 
[[Category:On this day in September|September 09]]

Revision as of 13:41, 3 September 2018

On September 9 in SVRSevern Valley Railway history.

  • 1963 Passenger services between Shrewsbury and Bewdley ceased.[1]
  • 1973 After several test steamings and checks, LNER 3442 The Great Marquess worked Bridgnorth to Hampton Loade services for the first time since arrival and overhaul at the SVRSevern Valley Railway.[2]
  • 1979 2857, the first ChurchwardGeorge Jackson Churchward, Chief Mechanical Engineer (CME) of the Great Western Railway 1902-1922 2-8-0 to be steamed in preservation, moved under her own power for the first time.[3]
  • 1994 LMR 600 Gordon was the first steam locomotive to use Kidderminster Turntable[4].

Gallery

Photos taken on 9 September:

See also

On this day in SVRSevern Valley Railway history

← September 8 - September 10 →

References

  1. Smith (1968) p. 26.
  2. SVRSevern Valley Railway News 29
  3. SVRSevern Valley Railway News 53
  4. SVRSevern Valley Railway News 112