Difference between revisions of "SVR timetables"

From SVR Wiki
Jump to: navigation, search
(2010 - 2017)
(reformatted and text added)
 
Line 1: Line 1:
 
{{Stub}}
 
{{Stub}}
 +
This page includes images of published SVR timetables since opening in 1970
 +
 +
==1970 - 1973: Bridgnorth to Hampton Loade==
  
==Gallery==
 
 
<gallery>
 
<gallery>
 
File:1970 timetable001.jpg | 1970
 
File:1970 timetable001.jpg | 1970
Line 13: Line 15:
 
File:1973 timetable001.jpg | 1973
 
File:1973 timetable001.jpg | 1973
 
File:1973 timetable002.jpg | 1973
 
File:1973 timetable002.jpg | 1973
 +
</gallery>
 +
 +
==1974 – 1984: Bridgnorth to Bewdley==
 +
The line opened as far as [[Highley]] in April 1974 while work was completed on replacing the [[Underbridge on Station Road, Highley|underbridge south of the station]]. The full line to Bewdley opened in May 1974, although crossing at [[Arley]] was not possible until the Up loop (the line nearest the station) was [[Arley#Restoration| recommissioned in 1975]].
 +
 +
<gallery>
 +
File:1974 timetable005.jpg | 1974 (Highley)
 +
File:1974 timetable006.jpg | 1974 (Highley)
 
File:1974 timetable001.jpg | 1974
 
File:1974 timetable001.jpg | 1974
 
File:1974 timetable002.jpg | 1974
 
File:1974 timetable002.jpg | 1974
 
File:1974 timetable003.jpg | 1974
 
File:1974 timetable003.jpg | 1974
 
File:1974 timetable004.jpg | 1974
 
File:1974 timetable004.jpg | 1974
File:1974 timetable005.jpg | 1974
 
File:1974 timetable006.jpg | 1974
 
 
File:1975 timetable001.jpg | 1975
 
File:1975 timetable001.jpg | 1975
 
File:1975 timetable002.jpg | 1975
 
File:1975 timetable002.jpg | 1975
Line 40: Line 48:
 
File:1984 timetable002.jpg | 1984
 
File:1984 timetable002.jpg | 1984
 
File:1984 timetable003.jpg | 1984
 
File:1984 timetable003.jpg | 1984
 +
</gallery>
 +
 +
==1984 onwards: Bridgnorth to Kidderminster==
 +
A second version of the 1984 timetable was published with the opening of the full line to Kidderminster on 31 July 1984.
 +
 +
In 2007 the line was closed by the [[2007 Storm Damage|storm damage]] in June. A limited service operated at the start of 2008 with full line services resuming at Easter, coinciding with the opening of [[The Engine House]].
 +
 +
<gallery>
 
File:1984 timetable005a.jpg | 1984
 
File:1984 timetable005a.jpg | 1984
 
File:1984 timetable006.jpg | 1984
 
File:1984 timetable006.jpg | 1984
Line 135: Line 151:
 
File:2017 timetable 002.jpg | 2017
 
File:2017 timetable 002.jpg | 2017
 
</gallery>
 
</gallery>
 +
  
 
==See also==
 
==See also==

Latest revision as of 11:54, 29 January 2023

Level-crossing-without-barrier-or-gate-ahead.jpg Stub article This article is a stub. You can help svrwiki by expanding it.

This page includes images of published SVRSevern Valley Railway timetables since opening in 1970

1970 - 1973: Bridgnorth to Hampton Loade

1974 – 1984: Bridgnorth to Bewdley

The line opened as far as Highley in April 1974 while work was completed on replacing the underbridge south of the station. The full line to Bewdley opened in May 1974, although crossing at Arley was not possible until the UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) loop (the line nearest the station) was recommissioned in 1975.

1984 onwards: Bridgnorth to Kidderminster

A second version of the 1984 timetable was published with the opening of the full line to Kidderminster on 31 July 1984.

In 2007 the line was closed by the storm damage in June. A limited service operated at the start of 2008 with full line services resuming at Easter, coinciding with the opening of The Engine House.


See also