Difference between revisions of "November 6"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. *1968 Highley Colliery was completely closed. Coal winding had ended in 19...")
 
Line 1: Line 1:
On {{PAGENAME}} in SVR history.
+
[[File: Bridge_8_20150606.jpg |thumb|300px|right| Bewdley Bypass Bridge was jacked into place on 6 November 1986]]On {{PAGENAME}} in SVR history.
 +
 
 +
*1968 [[Collieries served by the Severn Valley Railway#Highley Colliery|Highley Colliery]] was completely closed. Coal winding had ended in 1940, but the pithead remained in use for ventilation and personnel access to [[Collieries served by the Severn Valley Railway#Alveley Colliery|Alveley Colliery]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 100.</ref>
 +
*[[Severn Valley Railway Timeline 1980-1989#1986|1986]] Hydraulic rams were used to move the 2,500 ton concrete [[Bewdley Bypass Bridge]] around 150ft into its final position.<ref>Marshall (1989) p. 91.</ref>
  
*1968 [[Collieries served by the Severn Valley Railway#Highley Colliery|Highley Colliery]] was completely closed. Coal winding had ended in 1940, but the pithead remained in use for ventilation and personnel access to [[Collieries served by the Severn Valley Railway#Alveley Colliery|Alveley Colliery]].
 
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in November|November 06]]
 
[[Category:On this day in November|November 06]]

Revision as of 15:28, 1 November 2017

Bewdley Bypass Bridge was jacked into place on 6 November 1986
On November 6 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← November 5 - November 7 →

References

  1. Marshall (1989) p. 100.
  2. Marshall (1989) p. 91.