(Created page with "On {{PAGENAME}} in SVR history. *1893 The GWR approved the provision of railings along the coping of the walls of Sandbourne Viaduct. ==See also== {{On this day see al...")
 
m
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*1893 The GWR approved the provision of railings along the coping of the walls of [[Sandbourne Viaduct]].
+
*1893 The GWR approved the provision of railings along the coping of the walls of [[Sandbourne Viaduct]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 91.</ref>
 +
*1983 In preparation for track relaying at [[Eardington]], the track was slued so light engine movements during the Santa services could pass via the siding<ref>SVR News 71</ref>.
 
   
 
   
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in November]]
 
[[Category:On this day in November]]

Revision as of 15:57, 26 November 2018

On November 27 in SVRSevern Valley Railway history.

  • 1893 The GWRGreat Western Railway approved the provision of railings along the coping of the walls of Sandbourne Viaduct.[1]
  • 1983 In preparation for track relaying at Eardington, the track was slued so light engine movements during the Santa services could pass via the siding[2].

See also

On this day in SVRSevern Valley Railway history

← November 26 - November 28 →

References

  1. Marshall (1989) p. 91.
  2. SVRSevern Valley Railway News 71