Difference between revisions of "November 1"

From SVR Wiki
Jump to: navigation, search
(Details added)
 
Line 2: Line 2:
  
 
*1860 The Severn Valley Railway Leasing Act came into force. As a result the railway would be leased to the [[West Midland Railway]] from opening, instead of the [[Oxford Worcester and Wolverhampton Railway|OWW]].<ref>[[Bibliography#Books|Nabarro (1971)]] p. 42.</ref>
 
*1860 The Severn Valley Railway Leasing Act came into force. As a result the railway would be leased to the [[West Midland Railway]] from opening, instead of the [[Oxford Worcester and Wolverhampton Railway|OWW]].<ref>[[Bibliography#Books|Nabarro (1971)]] p. 42.</ref>
 +
*1864 Passenger services on GWR's Wellington to Craven Arms Branch commenced, which crossed the Severn Valley Branch at [[Buildwas]] and used the [[Albert Edward Bridge]].
 +
*1980 [[Ruston and Hornsby 165hp Diesel Electric Shunter D2961]] arrived on the SVR.
 
*[[Severn Valley Railway Timeline 1980-1989#1982 | 1982]] P. Way staff lifted the track south of Bridgnorth station as work began on installing [[Bridgnorth Bypass Bridge]].<ref>SVR News 66</ref>
 
*[[Severn Valley Railway Timeline 1980-1989#1982 | 1982]] P. Way staff lifted the track south of Bridgnorth station as work began on installing [[Bridgnorth Bypass Bridge]].<ref>SVR News 66</ref>
 
*1997 [[50031|Class 50 50031 Hood]] made a main line debut in preservation, hauling the 'Pilgrim Hoover' from Birmingham International to Plymouth.
 
*1997 [[50031|Class 50 50031 Hood]] made a main line debut in preservation, hauling the 'Pilgrim Hoover' from Birmingham International to Plymouth.

Latest revision as of 12:28, 18 October 2019

Installation of Bridgnorth Bypass Bridge began on 1 November 1982
On November 1 in SVRSevern Valley Railway history.


See also

On this day in SVRSevern Valley Railway history

← October 31 - November 2 →

References

  1. Nabarro (1971) p. 42.
  2. SVRSevern Valley Railway News 66