Difference between revisions of "May 31"

From SVR Wiki
Jump to: navigation, search
(Updated Portakabin info)
(Info added)
 
Line 3: Line 3:
 
*1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 107.</ref>
 
*1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 107.</ref>
 
*1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.<ref>SVR News 52</ref> It was retired from public use at the end of 2018, although retained on a further temporary basis while staff facilities became operational.
 
*1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.<ref>SVR News 52</ref> It was retired from public use at the end of 2018, although retained on a further temporary basis while staff facilities became operational.
 +
*2011 [[BR Class 09 09107]] was withdrawn from mainline service
  
 
==See also==
 
==See also==

Latest revision as of 08:49, 25 May 2019

On May 31 in SVRSevern Valley Railway history.

  • 1905 The GWRGreat Western Railway authorised the construction of 'further cattle accommodation' at Bridgnorth.[1]
  • 1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.[2] It was retired from public use at the end of 2018, although retained on a further temporary basis while staff facilities became operational.
  • 2011 BR Class 09 09107 was withdrawn from mainline service

See also

On this day in SVRSevern Valley Railway history

← May 30 - June 1 →

References

  1. Marshall (1989) p. 107.
  2. SVRSevern Valley Railway News 52