Difference between revisions of "May 31"
From SVR Wiki
(Info added) |
|||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
*1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 107.</ref> | *1905 The GWR authorised the construction of 'further cattle accommodation' at [[Bridgnorth]].<ref>[[Bibliography#Books|Marshall (1989)]] p. 107.</ref> | ||
− | *1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.<ref>SVR News 52</ref> It | + | *1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.<ref>SVR News 52</ref> It was retired from public use at the end of 2018, although retained on a further temporary basis while staff facilities became operational. |
+ | *2011 [[BR Class 09 09107]] was withdrawn from mainline service | ||
==See also== | ==See also== |
Latest revision as of 08:49, 25 May 2019
On May 31 in SVRSevern Valley Railway history.
- 1905 The GWRGreat Western Railway authorised the construction of 'further cattle accommodation' at Bridgnorth.[1]
- 1979 A Portakabin was delivered to Bridgnorth for use as a "temporary" buffet / restaurant facility.[2] It was retired from public use at the end of 2018, although retained on a further temporary basis while staff facilities became operational.
- 2011 BR Class 09 09107 was withdrawn from mainline service
See also
On this day in SVRSevern Valley Railway history
References
- ↑ Marshall (1989) p. 107.
- ↑ SVRSevern Valley Railway News 52