Difference between revisions of "May 18"

From SVR Wiki
Jump to: navigation, search
(Info added)
(move to correct date)
Line 8: Line 8:
 
*[[Severn_Valley_Railway_Timeline_1980-1989 | 1983]] The line reopened following a closure caused by an embankment collapse south of [[Bridgnorth Bypass Bridge]] on April 30th.<ref>SVR News 68</ref>
 
*[[Severn_Valley_Railway_Timeline_1980-1989 | 1983]] The line reopened following a closure caused by an embankment collapse south of [[Bridgnorth Bypass Bridge]] on April 30th.<ref>SVR News 68</ref>
 
*1978 [[BR Standard Class 7 70000 Britannia|70000 Britannia]] was steamed for the first time in 12 years.
 
*1978 [[BR Standard Class 7 70000 Britannia|70000 Britannia]] was steamed for the first time in 12 years.
*1980 [[LMS Ivatt Class 4 43106|43106]] left for the Rocket 150 celebrations at Rainhill, still in black undercoat.
 
 
*1994 An inquest was held into the fatal accident at [[Waterworks Crossing]] in January. A verdict of accidental death was recorded, with no blame attached to the SVR.<ref>SVR News 111</ref>
 
*1994 An inquest was held into the fatal accident at [[Waterworks Crossing]] in January. A verdict of accidental death was recorded, with no blame attached to the SVR.<ref>SVR News 111</ref>
 
*1996 [[GWR Mogul 7325]] commenced two weekends of London Underground 'Steam on the Met' services
 
*1996 [[GWR Mogul 7325]] commenced two weekends of London Underground 'Steam on the Met' services

Revision as of 15:50, 5 May 2020

On May 18 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← May 17 - May 19 →

References

  1. SVRSevern Valley Railway News 28
  2. 2.0 2.1 2.2 SVRSevern Valley Railway News 32
  3. SVRSevern Valley Railway News 68
  4. SVRSevern Valley Railway News 111
  5. SVRSevern Valley Railway News 124