Difference between revisions of "March 5"
From SVR Wiki
m (add pictures etc) |
m (add pictures etc) |
||
Line 8: | Line 8: | ||
<gallery> | <gallery> | ||
Bus_Garage_20160305.jpg | 2016: [[GWR Bus Garage (Ex Bridgnorth)]] at Kidderminster | Bus_Garage_20160305.jpg | 2016: [[GWR Bus Garage (Ex Bridgnorth)]] at Kidderminster | ||
+ | 34027_20160305.jpg | [[34027|34027 Taw Valley]] at Highley | ||
</gallery> | </gallery> |
Revision as of 23:04, 4 March 2018
On March 5 in SVRSevern Valley Railway history.- 1884 The GWRGreat Western Railway authorised the construction of Stourport interchange basin.[1]
- 1983 The line south of Bridgnorth reopened for passenger services after completion of the Bridgnorth Bypass Bridge[2].
Gallery
Photos taken on 5 March:
2016: GWR Bus Garage (Ex Bridgnorth) at Kidderminster
34027 Taw Valley at Highley
See also
On this day in SVRSevern Valley Railway history
References
- ↑ Marshall (1989) p. 89.
- ↑ SVRSevern Valley Railway News 68