The station was originally accessed from the Hall via a ferry. In 1905 a suspension bridge was built by David Rowell & Co of Westminster.<ref name=marshall/>
 
The station was originally accessed from the Hall via a ferry. In 1905 a suspension bridge was built by David Rowell & Co of Westminster.<ref name=marshall/>
 +
 +
[[SVR staff in 1922#Severn Valley Railway (North of Bridgnorth)|GWR staff records for 1922]] show the station had a station master but no other staff.
  
 
==Traffic statistics==
 
==Traffic statistics==

Revision as of 16:54, 5 January 2021

Ex-LMSLondon Midland & Scottish Railway 41202 with a Southbound train in October 1962 (Sellick Collection)
The same locomotive a year later in August 1963, this time running Northbound (Sellick Collection)
Next stations pre-closure
Towards Hartlebury and Kidderminster Towards Shrewsbury
Bridgnorth (4¼ miles) Coalport (2½ miles)

Linley Station was located 22½ miles from Hartlebury and 18¼ miles from Shrewsbury. It was the first station north of Bridgnorth, and had a single platform with no passing loop.

Construction and history

Apley Hall in 2008, seen from near the location of Linley Station
The 1905 suspension bridge in 2008

The Severn Valley Railway passes through the Apley Park estate, owned at the time of the line's construction by Thomas C Whitmore. Although his property was located on the opposite bank of the River Severn, Whitmore opposed the Railway's construction as "utterly annihilating the privacy and seclusion of the said, mansion, house, park and grounds". Whitmore had already sponsored a rival and ultimately unsuccessful proposal, the Shrewsbury, Ironbridge and Bridgnorth Railway whose route was planned to cross the Severn at Quatford, south of Bridgnorth and pass to the east of Apley Park before joining Shrewsbury and Birmingham Railway's Madeley Branch. A Bill to construct that railway was introduced to Parliament in February 1853 but was thrown out in June of that year.[1]

To overcome Whitmore's opposition, the route authorised by the original Severn Valley Railway Act of 1853 included running the line through tunnels under the estate. Negotiations to reduce the cost of the line resulted in a revised route not including tunnels, authorised in the second Severn Valley Railway Act of 1855.[2] To achieve this the Severn Valley Railway Company paid Whitmore £14,000 in compensation as well as £150 per acre for the land purchased, and in addition were required to provide a station at which at least two trains per day in each direction could be stopped on request.[3] Linley Station, built to meet this condition, had no public road access.[2] Although Construction of the Severn Valley Railway began in 1858, Whitmore's land was among the last to be acquired in 1860.

Despite his initial opposition to the railway, Whitmore cut down a number of trees after the railway opened in 1862, so that he could have a better view of passing trains. However he died on 13 March 1865, aged only 58[2] (expectancy would have been about 70).[4]

On 8 June 1862 a porter at Linley left the station a little before midday, having confirmed to the station-master that he would return 'before train time' (5:30pm). In the event he did not return until the following Wednesday morning. He was brought before the South Shropshire Magistrates charged with having "absented himself from the employment of the West Midland Railway Company, without having previously obtained leave or given the required 14 days’ notice". The Bench said the prisoner had rendered himself liable to suffer two months' imprisonment with hard labour, or a penalty of £10. However they had power to mitigate the penalty, and he was to pay a fine of £1 or go to prison for 14 days.[5]

The station was originally accessed from the Hall via a ferry. In 1905 a suspension bridge was built by David Rowell & Co of Westminster.[2]

GWR staff records for 1922 show the station had a station master but no other staff.

Traffic statistics

GWR Traffic statistics for Linley, selected years prior to 1939[6]
Passenger Traffic Freight Traffic
Year Tickets issued Parcels despatched Revenue (£) Tons received & despatched Revenue (£) Total revenue (£)
1903 5,280 1,506 403 159 71 474
1913 4,780 1,537 433 772 149 612
1923 4,569 836 462 212 51 513
1933 3,482 931 303 253 90 393
1938 3,750 722 263 454 201 464

Closure

Linley Station in 2007

The station had a goods siding as shown on the OSOrdnance Survey maps. The short goods loop was removed in about 1939[7] and the siding was closed altogether on 10 September 1951; the station was officially reduced to the status of a halt at the same time.[2]

Following closure of the line in 1963, the station was converted to a private house.

Historic maps of Linley station

  • 1883 map showing the station and siding, with the nearby ferry serving Apley Hall also shown
  • 1902 map showing the station and siding. A 'points box' is shown giving access to the siding- possibly a ground frame?
  • 1927 map showing the station and siding, with the 1905 suspension bridge also shown

See also

References

  1. Marshall (1989) p. 24.
  2. 2.0 2.1 2.2 2.3 2.4 Marshall (1989) pp. 31-36,107.
  3. Vanns (1998) p. 49.
  4. Life Expectancy in years at various ages, by decade (Retrieved 1 May 2019)
  5. Wellington Journal 28 June 1862, reported in Broseley Papers
  6. Nabarro (1971) p. 55.
  7. Mitchell and Smith (2007) fig. XIV.

Links