Before the comissioning of Kidderminster signal box, the connections to Platform 1 were controlled by a ground frame, which was unlocked by the [[Bewdley South signal box|Bewdley South]]-[[Kidderminster]] staff. The signal box was commissioned on 21/11/1987, which is probably when the ground frame was taken out of use. It is not known whether the ground frame controlled any points other than those leading to Platform 1 and the run-round line.
== References --==
* "Kidderminster". Signal box profile on the Severn Valley Railway S&T Department (unofficial) website. [http://www.svrsig.org/svr/Frame1.htm Link]. Accessed 10/01/2015.