Difference between revisions of "June 1"

From SVR Wiki
Jump to: navigation, search
m (move item to June 1 per SVR News)
Line 5: Line 5:
 
*1878 The [[Kidderminster Loop Line]] opened.
 
*1878 The [[Kidderminster Loop Line]] opened.
 
*1895 The original [[Bridgnorth#Footbridge outside Bridgnorth Station|footbridge outside Bridgnorth Station]] was opened to the public.
 
*1895 The original [[Bridgnorth#Footbridge outside Bridgnorth Station|footbridge outside Bridgnorth Station]] was opened to the public.
 +
*[[Severn Valley Railway Timeline 1965-1969#1967 | 1967]] Contracts were exchanged between BR and the SVR for the purchase of the line between [[Bridgnorth]] and [[Alveley Sidings]].
 
*[[Severn Valley Railway Timeline 1980-1989#1980 | 1980]] The [[Kidderminster Turntable|ex-Fort William 70ft turntable now at Kidderminster]] was moved from the Bluebell Railway to Bewdley.
 
*[[Severn Valley Railway Timeline 1980-1989#1980 | 1980]] The [[Kidderminster Turntable|ex-Fort William 70ft turntable now at Kidderminster]] was moved from the Bluebell Railway to Bewdley.
 
*[[Severn Valley Railway Timeline 2010-2019#2011 | 2011]] The SVR ran a special train with proceeds going to help the Gloucestershire Warwickshire Steam Railway recover from two embankment collapses.
 
*[[Severn Valley Railway Timeline 2010-2019#2011 | 2011]] The SVR ran a special train with proceeds going to help the Gloucestershire Warwickshire Steam Railway recover from two embankment collapses.

Revision as of 13:43, 27 June 2017

On June 1 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← May 31 - June 2 →