Difference between revisions of "January 21"

From SVR Wiki
Jump to: navigation, search
(Info added)
 
Line 3: Line 3:
 
*1932 The GWR Traffic Committee discussed improvements to the track layout and signalling at [[Bewdley South signal box|Bewdley South]].<ref>SVR News 137</ref>
 
*1932 The GWR Traffic Committee discussed improvements to the track layout and signalling at [[Bewdley South signal box|Bewdley South]].<ref>SVR News 137</ref>
 
*1968 The section of track between [[Berrington]] and [[Shrewsbury]], which had remained in use for testing Sentinel diesels after closure in 1963, was finally closed by BR.  
 
*1968 The section of track between [[Berrington]] and [[Shrewsbury]], which had remained in use for testing Sentinel diesels after closure in 1963, was finally closed by BR.  
 +
*1991 An episode of [[Rosie and Jim]], titled 'Steam', first aired and included images of [[LMS Stanier 8F 48773]] on [[Victoria Bridge]].
 +
 
==See also==
 
==See also==
  

Latest revision as of 18:28, 7 January 2020

On January 21 in SVRSevern Valley Railway history.

  • 1932 The GWRGreat Western Railway Traffic Committee discussed improvements to the track layout and signalling at Bewdley South.[1]
  • 1968 The section of track between Berrington and Shrewsbury, which had remained in use for testing Sentinel diesels after closure in 1963, was finally closed by BRBritish Rail or British Railways.
  • 1991 An episode of Rosie and Jim, titled 'Steam', first aired and included images of LMS Stanier 8F 48773 on Victoria Bridge.

See also

On this day in SVRSevern Valley Railway history

← January 20 - January 22 →

References

  1. SVRSevern Valley Railway News 137