January 18

From SVR Wiki
Revision as of 18:41, 4 January 2020 by Patrick Hearn (talk | contribs) (Info added)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

On January 18 in SVRSevern Valley Railway history.

  • 2011 Major engineering work was in progress at Arley during the winter shut-down. This included the removal and rebuilding of platform surfaces and unstable platform walls and the installation of new drainage beneath the track.[1] Photos of work in progress on the 18th may be found in "Sharpo's Blog.
  • 2019 BR Class 09 09107 carried out its first shunt in preservation.

See also

On this day in SVRSevern Valley Railway history

← January 17 - January 19 →

References

  1. SVRSevern Valley Railway News 172/173