January 18

On January 18 in SVR history.

  • 2011 Major engineering work was in progress at Arley during the winter shut-down. This included the removal and rebuilding of platform surfaces and unstable platform walls and the installation of new drainage beneath the track.[1] Photos of work in progress on the 18th may be found in "Sharpo's Blog.
  • 2019 BR Class 09 09107 carried out its first shunt in preservation.

See also

On this day in SVR history

← January 17 - January 19 →

References

  1. SVR News 172/173