Difference between revisions of "January 18"

From SVR Wiki
Jump to: navigation, search
(create page for January 18)
 
m (Info added)
 
Line 2: Line 2:
  
 
*2011 Major engineering work was in progress at [[Arley]] during the winter shut-down. This included the removal and rebuilding of platform surfaces and unstable platform walls and the installation of new drainage beneath the track.<ref>SVR News 172/173</ref> Photos of work in progress on the 18th may be found in [http://www.sharpos-world.co.uk/blog/?p=6334 "Sharpo's Blog].
 
*2011 Major engineering work was in progress at [[Arley]] during the winter shut-down. This included the removal and rebuilding of platform surfaces and unstable platform walls and the installation of new drainage beneath the track.<ref>SVR News 172/173</ref> Photos of work in progress on the 18th may be found in [http://www.sharpos-world.co.uk/blog/?p=6334 "Sharpo's Blog].
 +
*2019 [[BR Class 09 09107]] carried out its first shunt in preservation.
 
    
 
    
 
==See also==
 
==See also==

Latest revision as of 18:41, 4 January 2020

On January 18 in SVRSevern Valley Railway history.

  • 2011 Major engineering work was in progress at Arley during the winter shut-down. This included the removal and rebuilding of platform surfaces and unstable platform walls and the installation of new drainage beneath the track.[1] Photos of work in progress on the 18th may be found in "Sharpo's Blog.
  • 2019 BR Class 09 09107 carried out its first shunt in preservation.

See also

On this day in SVRSevern Valley Railway history

← January 17 - January 19 →

References

  1. SVRSevern Valley Railway News 172/173