Difference between revisions of "Highley Station Footbridge"

From SVR Wiki
Jump to: navigation, search
Line 2: Line 2:
  
 
==See also==
 
==See also==
[[List of infrastructure]]
+
[[Underbridge on Station Road, Highley | Towards Kidderminster]]<br>
 +
[[List of infrastructure]]<br>
 +
[[Highley Station foot crossing | Towards Bridgnorth]]

Revision as of 08:39, 10 June 2015

Highley Station Footbridge was constructed in 2009 and opened by HRH The Duke of Gloucester on 21 October of that year. It replaced a longer footbridge on the same site which was deemed beyond economical repair and demolished for scrap in spring 1974. The design and painting of the new footbridge was intended to mimic the original.

See also

Towards Kidderminster
List of infrastructure
Towards Bridgnorth