High speed testing

From SVR Wiki
Revision as of 18:07, 20 April 2018 by Patrick Hearn (talk | contribs) (New page stub, I know there are more to add)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

As with other heritage railways, the SVRSevern Valley Railway operates normal services at a maximum speed of 25 mph under its Light Railway Order and Safety case. The SVRSevern Valley Railway and Great Central Railway have permission to operate non-passenger carrying trains at higher speeds under certain controlled conditions.

Class 175 'Coradia 1000' diesel multiple units 1999-2000

From 1 August 1999 the speed limit was increased to 50 mph to allow commissioning of Alstom's new Birmingham-built units, owned by Angel Trains and destined for First North Western. A special temporary shed with a pit road was built for the purpose outside the Carriage Repair Works at Kidderminster.[1] Prominent notices were in place on rights of way by the previous April to warn the public of the increased speeds. Testing took place while no other trains were in service.


See also

Main Page

References

  1. Train testing.com (Retrieved 20 April 2018)

Links

Train testing.com
Class 175 on Wikipedia