Difference between revisions of "Hampton Loade signal box"

From SVR Wiki
Jump to: navigation, search
(Created page with "Hampton Loade Signal Box (HL) is a McKenzie and Holland-style signal box, situated on the Up end of the main platform at Hampton Loade station. == History =...")
 
(Added Pensnett)
(20 intermediate revisions by 6 users not shown)
Line 1: Line 1:
Hampton Loade Signal Box (HL) is a McKenzie and Holland-style signal box, situated on the Up end of the main platform at [[Hampton Loade|Hampton Loade station]].
+
[[File:Hampton_Loade_Signal_Box_20150704.jpg|thumb|300px|right|Hampton Loade Signal Box]]
 +
 
 +
Hampton Loade Signal Box (HL) is a McKenzie and Holland-style signal box, situated on the Up end of the main platform at [[Hampton Loade|Hampton Loade station]]. It works to [[Bridgnorth signal box|Bridgnorth]] and [[Highley signal box|Highley]] using [[Single line working using tokens|ETT regulations]].
  
 
== History ==
 
== History ==
  
The original signal box was built in 1883 (?), in conjunction with the addition of a loop and second platform to the station. On the closure of the line in 1963, the box was largely dismantled, with parts reportedly being used to build a chicken coop in the garden of the station house. The box was rebuilt, starting in 1971, using parts from the original box and that at Stourport, incorporating the lever frame from Ledbury North End. The new box and signalling was recommissioned on 19/05/1973, initially working to Bridgnorth using One Engine in Steam, and then Electric Token Block a few weeks later after the commissioning of the token instruments. The ETT section to Highley was signed into use on 02/03/1974.
+
The original signal box was brought into use in 1883 in conjunction with the addition of a loop and second platform, with Board of Trade approval of the new arrangements being granted in June of that year.<ref>[[Bibliography#Books|Marshall (1989)]] p. 101.</ref> The section to Highley latterly contained two ground frames released by the token, [[Alveley North ground frame|Alveley North]] and [[Alveley South ground frame|Alveley South]], allowing access to the [[Alveley Sidings|coal sidings at Alveley]]. An intermediate token instrument was also provided.
  
The box gained the ability to switch out by Whitsun in 1975, and the down and up distants were brought into use in 1981 and 1982.
+
On the closure of the line in 1963, the box was largely dismantled, with parts reportedly being used to build a chicken coop in the garden of the station house. The box was rebuilt, starting in 1971, using parts from the original box and that at Stourport, incorporating the lever frame from Ledbury North End. Also used was Pensnett box: the top floor had been moved to [[Bridgnorth signal box]] in November 1968 but the wooden ground floor sections were left in situ at Pensnett.<ref>SVR News 11, p.19.</ref> They were then taken apart in January 1970 and moved to Hampton Loade where they were used in rebuilding the partly demolished box there.<ref>SVR News 16, p.18.</ref> Having been built around the original frame of the building, it is a facsimile of the original box. The new box and signalling was recommissioned on 19 May 1973, initially working to Bridgnorth using One Engine in Steam, and then [[Single line working using tokens|Electric Token Block]] a few weeks later after the commissioning of the token instruments. The ETT section to Highley was signed into use on 2 March 1974, with the token releasing Alveley South ground frame.
 
+
Several overhauls of the box equipment have been carried out, including point rodding in 1982, rewiring in 1983, the mechanical interlocking in 1992, and a second rewiring in 2012/2013. The latter was done in conjunction with the resiting of the token instruments, which had previously been sited on the brick support for the fireplace, which was not rebuilt in 1973. A replacement fireplace and chimney were brought into use on 27/12/2014.
+
The box gained the ability to switch out by Whitsun in 1975, and the down and up distants were brought into use in 1981 and 1982. Several overhauls of the box equipment have been carried out, including point rodding in 1982, rewiring in 1983, the mechanical interlocking in 1992, and a second rewiring in 2012/2013. The latter was done in conjunction with the resiting of the token instruments, which had previously been sited on the brick support for the fireplace, which was not rebuilt in 1973. A replacement fireplace and chimney were brought into use on 27 December 2014. Refurbishment in 2019 saw new steps made in the correct style, new shiplap boarding and new windows for the locking room.<ref>Hampton Loade Facebook 18 April 2019</ref>
  
 
== Operation and Equipment ==
 
== Operation and Equipment ==
Line 13: Line 15:
 
=== Lever Frame ===
 
=== Lever Frame ===
  
Hampton Loade contains a 16-lever GWR tappet frame, put together from a frame from Ledbury North End, with 15 working levers, no spares, and one space.
+
Hampton Loade contains a 16-lever GWR 5-bar vertical tappet frame dating from 1938, replacing the original which was removed and scrapped on the closure of the line. It was originally in Ledbury North End Signal Box, with 15 working levers, no spares, and one space.
  
 
=== Block Sections ===
 
=== Block Sections ===
  
The box works in both directions using Electric Token Block regulations, has two Tyer's No. 9 token instruments, and is able to switch out. The adjacent signal boxes are Highley (up) and Bridgnorth (down), which work directly to each other when Hampton Loade is switched out. The intermediate siding at Eardington can only be accessed on the long section token.
+
The box works in both directions using [[Single line working using tokens|Electric Token Block]] regulations, has two Tyer's No. 9 token instruments, and is able to switch out. The adjacent signal boxes are Highley (up) and Bridgnorth (down), which work directly to each other when Hampton Loade is switched out. The intermediate siding at [[Eardington]] can only be accessed on the long section token.
 +
 
 +
==Signalling diagram==
 +
 
 +
[[File:Hampton Loade box diagram.gif]]
 +
 
 +
==Levers and Lever Leads==
 +
 
 +
[[File:Hampton Loade levers.jpg|800px]]
 +
 
 +
=== List of levers ===
 +
 
 +
{| class="wikitable"
 +
! style="text-align:left;" | No. !! style="text-align:left;" | Colour !! style="text-align:left;" | Description !! style="text-align:left;" | Lever Sequence
 +
|-
 +
| 1 || Yellow || Up Main distant || 2
 +
|-
 +
| 2 || Red || Up Main Home When Switched Out || 8 To Notch 3
 +
|-
 +
| 3 || Red || Up Main Home || 5
 +
|-
 +
| 4 || Red+White Band || Up Main Start'g || 11
 +
|-
 +
| 5 || Blue || FPL For Nº 6 || Nil Or 6
 +
|-
 +
| 6 || Black || Up Main Facing || From Down Main
 +
|-
 +
| 7 ||  || Space ||
 +
|-
 +
| 8 || Red+Black Band || Switching Out Lever|| 12 6 5 <nowiki>[Electric Switch]</nowiki> To Notch 3 - 1 16
 +
|-
 +
| 9 || Red || Disc For Nº 10 || 10
 +
|-
 +
| 10 || Black || Up Main || Siding
 +
|-
 +
| 11 || Black || Down Main Facing || From Up Main
 +
|-
 +
| 12 || Blue || F.P.L. For Nº 11 ||
 +
|-
 +
| 13 || Red+White Band || Up Main To Down Main Start'g ||
 +
|-
 +
| 14 || Red+White Band || Down Main Start'g || 6
 +
|-
 +
| 15 || Red || Down Main Home || 12
 +
|-
 +
| 16 || Yellow || Down Main distant || 14 15
 +
|}
 +
 
 +
==Signalling controlled from the box==
 +
 
 +
All signals are of late GWR/BR(W) steel tubular post and enamel arm design. Signal 16, the Down Distant, is motor worked.
  
== See Also ==
+
== See also ==
  
 
* [[List of signal boxes]]
 
* [[List of signal boxes]]
  
 
== References ==
 
== References ==
 
+
<references/>
 +
Also
 
* "Hampton Loade". Signal box profile on the Severn Valley Railway S&T Department (unofficial) website. [http://www.svrsig.org/svr/Frame7.htm Link]. Accessed 05/01/2015.
 
* "Hampton Loade". Signal box profile on the Severn Valley Railway S&T Department (unofficial) website. [http://www.svrsig.org/svr/Frame7.htm Link]. Accessed 05/01/2015.
 
+
* "Highley". Signal box profile on the Severn Valley Railway S&T Department (unofficial) website. [http://www.svrsig.org/svr/Frame6.htm Link]. Accessed 05/01/2015.
 
* "Hampton Loade Railway Station". Wikipedia article. [http://en.wikipedia.org/wiki/Hampton_Loade_railway_station Link]. Accessed 05/01/2015.
 
* "Hampton Loade Railway Station". Wikipedia article. [http://en.wikipedia.org/wiki/Hampton_Loade_railway_station Link]. Accessed 05/01/2015.
  
* "Hampton Loade Signal Box". Informational handout for signal box visits during a special event on 25/07/2004. Text transcribed by Dave Rowley, and available on his website. [http://www.fcet.staffs.ac.uk/dtr1/svr/stations/Hampton_Loade/signalbox-handout.html Link]. Accessed 05/01/2015.
+
[[Category:Featured articles]]

Revision as of 10:45, 18 December 2019

Hampton Loade Signal Box

Hampton Loade Signal Box (HL) is a McKenzie and Holland-style signal box, situated on the UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) end of the main platform at Hampton Loade station. It works to Bridgnorth and Highley using ETT regulations.

History

The original signal box was brought into use in 1883 in conjunction with the addition of a loop and second platform, with Board of Trade approval of the new arrangements being granted in June of that year.[1] The section to Highley latterly contained two ground frames released by the token, Alveley North and Alveley South, allowing access to the coal sidings at Alveley. An intermediate token instrument was also provided.

On the closure of the line in 1963, the box was largely dismantled, with parts reportedly being used to build a chicken coop in the garden of the station house. The box was rebuilt, starting in 1971, using parts from the original box and that at Stourport, incorporating the lever frame from Ledbury North End. Also used was Pensnett box: the top floor had been moved to Bridgnorth signal box in November 1968 but the wooden ground floor sections were left in situ at Pensnett.[2] They were then taken apart in January 1970 and moved to Hampton Loade where they were used in rebuilding the partly demolished box there.[3] Having been built around the original frame of the building, it is a facsimile of the original box. The new box and signalling was recommissioned on 19 May 1973, initially working to Bridgnorth using One Engine in Steam, and then Electric Token Block a few weeks later after the commissioning of the token instruments. The ETTElectric Train Token section to Highley was signed into use on 2 March 1974, with the token releasing Alveley South ground frame.

The box gained the ability to switch out by Whitsun in 1975, and the down and up distants were brought into use in 1981 and 1982. Several overhauls of the box equipment have been carried out, including point rodding in 1982, rewiring in 1983, the mechanical interlocking in 1992, and a second rewiring in 2012/2013. The latter was done in conjunction with the resiting of the token instruments, which had previously been sited on the brick support for the fireplace, which was not rebuilt in 1973. A replacement fireplace and chimney were brought into use on 27 December 2014. Refurbishment in 2019 saw new steps made in the correct style, new shiplap boarding and new windows for the locking room.[4]

Operation and Equipment

Lever Frame

Hampton Loade contains a 16-lever GWRGreat Western Railway 5-bar vertical tappet frame dating from 1938, replacing the original which was removed and scrapped on the closure of the line. It was originally in Ledbury North End Signal Box, with 15 working levers, no spares, and one space.

Block Sections

The box works in both directions using Electric Token Block regulations, has two Tyer's No. 9 token instruments, and is able to switch out. The adjacent signal boxes are Highley (up) and Bridgnorth (down), which work directly to each other when Hampton Loade is switched out. The intermediate siding at Eardington can only be accessed on the long section token.

Signalling diagram

Hampton Loade box diagram.gif

Levers and Lever Leads

Hampton Loade levers.jpg

List of levers

No. Colour Description Lever Sequence
1 Yellow UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main distant 2
2 Red UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main Home When Switched Out 8 To Notch 3
3 Red UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main Home 5
4 Red+White Band UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main Start'g 11
5 Blue FPLFacing Point Lock, equipment that physically locks points so that they cannot move. For Nº 6 Nil Or 6
6 Black UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main Facing From DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Main
7 Space
8 Red+Black Band Switching Out Lever 12 6 5 [Electric Switch] To Notch 3 - 1 16
9 Red Disc For Nº 10 10
10 Black UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main Siding
11 Black DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Main Facing From UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main
12 Blue F.P.LFacing Point Lock, equipment that physically locks points so that they cannot move.. For Nº 11
13 Red+White Band UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Main To DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Main Start'g
14 Red+White Band DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Main Start'g 6
15 Red DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Main Home 12
16 Yellow DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Main distant 14 15

Signalling controlled from the box

All signals are of late GWRGreat Western Railway/BRBritish Rail or British Railways(W) steel tubular post and enamel arm design. Signal 16, the DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Distant, is motor worked.

See also

References

  1. Marshall (1989) p. 101.
  2. SVRSevern Valley Railway News 11, p.19.
  3. SVRSevern Valley Railway News 16, p.18.
  4. Hampton Loade Facebook 18 April 2019

Also

  • "Hampton Loade". Signal box profile on the Severn Valley Railway S&TSignals & Telegraph Department (unofficial) website. Link. Accessed 05/01/2015.
  • "Highley". Signal box profile on the Severn Valley Railway S&TSignals & Telegraph Department (unofficial) website. Link. Accessed 05/01/2015.
  • "Hampton Loade Railway Station". Wikipedia article. Link. Accessed 05/01/2015.