Difference between revisions of "GWR 9581 Wheelchair accessible Buffet Car"

From SVR Wiki
Jump to: navigation, search
m (add link)
(add picture)
Line 1: Line 1:
 +
[[File: 5043_20150411.jpg |thumb|200px|right| GWR Full Third 5043]]
 
GWR Collett Bow-Ended Coach No 5043 is a standard 57ft full third coach, completed in June 1928 to diagram C54, lot 1383. The internal layout as built seated 64 passengers in eight compartments, with a side corridor and a toilet cubicle at each end.
 
GWR Collett Bow-Ended Coach No 5043 is a standard 57ft full third coach, completed in June 1928 to diagram C54, lot 1383. The internal layout as built seated 64 passengers in eight compartments, with a side corridor and a toilet cubicle at each end.
  

Revision as of 19:43, 15 April 2015

GWRGreat Western Railway Full Third 5043

GWRGreat Western Railway CollettCharles Benjamin Collett, Chief Mechanical Engineer (CME) of the Great Western Railway 1922-1941 Bow-Ended Coach No 5043 is a standard 57ft full third coach, completed in June 1928 to diagram C54, lot 1383. The internal layout as built seated 64 passengers in eight compartments, with a side corridor and a toilet cubicle at each end.

The coach was originally bought by the 2857 Society and arrived on the SVRSevern Valley Railway by rail in October 1981. Since arrival, it has served as the 2857 Society’s workshop, store and mess vehicle. Ownership passed to the Great Western (SVR) Assoc. in 2014.

Sources

Railway Heritage Register Carriage Survey
SVRSevern Valley Railway Stock Book Eighth Edition
2857 Society
Great Western (SVRSevern Valley Railway) Assoc.

Links

5043 on vintagecarriagestrust.org
5043 on 2857.org.uk
5043 on gw-svr-a.org.uk

See also

Carriages