Difference between revisions of "GWR 66 Breakdown Tool Van"
From SVR Wiki
(create page for GWR 66) |
(add picture) |
||
Line 1: | Line 1: | ||
+ | [[File: GWR_66_20150307.jpg |thumb|200px|right| GWR Beakdown Tool Van 66]] | ||
Breakdown Tool Van 66 was built in 1921 and first allocated to Taunton. | Breakdown Tool Van 66 was built in 1921 and first allocated to Taunton. | ||
Revision as of 21:44, 8 March 2015
Breakdown Tool Van 66 was built in 1921 and first allocated to Taunton.
It was acquired in 1985 by the The GWR 813 Preservation Fund, and is situated at Hampton Loade where it is used by The Barry Railway Carriage Trust as a sales vehicle.
Sources
Vintage Carriages Trust database
GWRGreat Western Railway 813 Preservation Fund
Links
GWR 66 on www.vintagecarriagestrust.org
GWR 66 on http://www.gwr813.org