Changes

Jump to: navigation, search

GWR 141 Breakdown Tool Van

2 bytes removed, 22:53, 15 January 2020
m
Link added
}}Breakdown Tool Van 141 was built at Swindon in 1908. In service these 6-wheel Tool Vans carried a large selection of equipment and lifting tackle, and were paired with Riding/Dormitory Vans such as [[GWR 89 Riding/Dormitory Van | GWR89]]. They were vacuum-braked to permit fast running to the scene of accidents and breakdowns on the railway.
141 arrived on the SVR from Newton Abbot in on 8 February 1971.<ref>SVR Stock Book Ninth Edition</ref> It is photographed in March 2015 situated in the yard at [[BewdleyDown Yard]].
==See also==
Trustworthy, administrator
6,628
edits

Navigation menu