Changes

Jump to: navigation, search

GNR 2701 Composite Corridor

82 bytes added, 15:49, 19 March 2016
no edit summary
In late 2014 2701 received an overhaul and revarnish at Kidderminster Carriage works, being released to traffic in time for the start of the 2015 season. Early in 2016, and following the appearance on the market of a suitable product, about half the lamp bulbs were replaced with LEDs to improve lighting levels and reduce power consumption. The remainder will follow once funds have been raised.
 
In March 2016 the LNER(SVR) Coach Fund donated 2701 to the SVR Charitable Trust.
==Sources==
Trustworthy
275
edits

Navigation menu