Difference between revisions of "February 24"

From SVR Wiki
Jump to: navigation, search
m (typo)
(Git vouchers)
Line 6: Line 6:
 
*1990 [[61994 The Great Marquess|LNER 3442 The Great Marquess]] arrived at Marylebone in the early hours of the morning for a railtour to Sheffield. A number of SVR London branch members helped with bagging and loading coal ready for the turnaround.<ref>SVR News 96</ref>   
 
*1990 [[61994 The Great Marquess|LNER 3442 The Great Marquess]] arrived at Marylebone in the early hours of the morning for a railtour to Sheffield. A number of SVR London branch members helped with bagging and loading coal ready for the turnaround.<ref>SVR News 96</ref>   
 
*2001 The underframe for [[Barry Railway Carriage 163]] was lifted into place at Hampton Loade using [[Cowans Sheldon 30-ton steam crane RS 1091|30 ton steam crane 1091/30]]<ref>SVR News 136</ref>.
 
*2001 The underframe for [[Barry Railway Carriage 163]] was lifted into place at Hampton Loade using [[Cowans Sheldon 30-ton steam crane RS 1091|30 ton steam crane 1091/30]]<ref>SVR News 136</ref>.
 +
*2018 A Facebook advertisement for the Mother's Day 'Afternoon Tea Special' invited the public to buy 'git vouchers' [sic]
  
 
==See also==
 
==See also==

Revision as of 10:09, 24 February 2018

On February 24 in SVRSevern Valley Railway history.

  • 1973 A revised contract was drawn up between SVR(H), the Guarantee Company and the SVRA, including the Board representation which each party would have.[1]
  • 1973 The SVRSevern Valley Railway's Civil Engineer was instructed to begin preparation of a Planning Application for Bridgnorth Bypass Bridge.[1]
  • 1989 John Cameron's A4 60009 Union of South Africa arrived on the SVRSevern Valley Railway for a one-year major overhaul.[2]
  • 1990 LNER 3442 The Great Marquess arrived at Marylebone in the early hours of the morning for a railtour to Sheffield. A number of SVRSevern Valley Railway London branch members helped with bagging and loading coal ready for the turnaround.[3]
  • 2001 The underframe for Barry Railway Carriage 163 was lifted into place at Hampton Loade using 30 ton steam crane 1091/30[4].
  • 2018 A Facebook advertisement for the Mother's Day 'Afternoon Tea Special' invited the public to buy 'git vouchers' [sic]

See also

On this day in SVRSevern Valley Railway history

← February 23 - February 25 →

References

  1. 1.0 1.1 SVRSevern Valley Railway News 27
  2. SVRSevern Valley Railway News 92
  3. SVRSevern Valley Railway News 96
  4. SVRSevern Valley Railway News 136