Difference between revisions of "February 11"

From SVR Wiki
Jump to: navigation, search
(Created page with "thumb|300px|right|Bewdley Tunnel looking towards KidderminsterOn {{PAGENAME}} in SVR history. *Severn Valley Railway Timeline 2010-201...")
 
 
Line 1: Line 1:
 
[[File:Bewdley_Tunnel_20150528.jpg |thumb|300px|right|Bewdley Tunnel looking towards Kidderminster]]On {{PAGENAME}} in SVR history.
 
[[File:Bewdley_Tunnel_20150528.jpg |thumb|300px|right|Bewdley Tunnel looking towards Kidderminster]]On {{PAGENAME}} in SVR history.
  
 +
*2004 Following a major overhaul, [[5164|Large Prairie 5164]] moved under her own power for the first time in more than 20 years.<ref>SVR News 146/147</ref>
 
*[[Severn Valley Railway Timeline 2010-2019#2012|2012]] Following six weeks of work to install new drainage and track in and adjacent to [[Bewdley Tunnel]], the line re-opened between Kidderminster and Bewdley.
 
*[[Severn Valley Railway Timeline 2010-2019#2012|2012]] Following six weeks of work to install new drainage and track in and adjacent to [[Bewdley Tunnel]], the line re-opened between Kidderminster and Bewdley.
 
==See also==
 
==See also==
  
 
{{On this day see also}}
 
{{On this day see also}}
 +
==References==
 +
<references />
  
 
[[Category:On this day in February]]
 
[[Category:On this day in February]]

Latest revision as of 16:40, 4 February 2018

Bewdley Tunnel looking towards Kidderminster
On February 11 in SVRSevern Valley Railway history.
  • 2004 Following a major overhaul, Large Prairie 5164 moved under her own power for the first time in more than 20 years.[1]
  • 2012 Following six weeks of work to install new drainage and track in and adjacent to Bewdley Tunnel, the line re-opened between Kidderminster and Bewdley.

See also

On this day in SVRSevern Valley Railway history

← February 10 - February 12 →

References

  1. SVRSevern Valley Railway News 146/147