Much of the infrastructure of the Severn Valley Railway was constructed to allow for future expansion to double track.
In general, overbridges and viaducts which would have been costly and disruptive to convert at a later date were built to double track width during initial construction of the line, whereas cuttings, embankments and smaller underbridges which could be widened at a later date without disrupting traffic were built to single track width.
Although the railway always remained single track, much evidence of the double trackbed is still visible, particularly in the form of wider bridge spans.

Although the deck of Victoria Bridge is currently only wide enough for a single track, the abutments and deck were originally built to double track width, similar to Albert Edward Bridge at Coalbrookdale.