Difference between revisions of "Demonstration Goods Train"

From SVR Wiki
Jump to: navigation, search
(Created page with "A demonstration goods train is run during the Spring Gala and Autumn Gala and offers a rare opportunity to see, and hear, a train of loose coupled (ie. unbraked) wagon...")
 
Line 1: Line 1:
 +
[[File:Highley - 43106 with down goods train in loop.jpg|thumb|200px|right|Highley - 43106 with down goods train in loop]]
 +
 
A demonstration goods train is run during the [[Spring Gala]] and [[Autumn Gala]] and offers a rare opportunity to see, and hear, a train of loose coupled (ie. unbraked) wagons.<br>
 
A demonstration goods train is run during the [[Spring Gala]] and [[Autumn Gala]] and offers a rare opportunity to see, and hear, a train of loose coupled (ie. unbraked) wagons.<br>
 
A variety of locos are used, with typically 12 to 18 wagons. As the wagons are mostly unbraked, a brake van (guard's van), is also used at the rear.
 
A variety of locos are used, with typically 12 to 18 wagons. As the wagons are mostly unbraked, a brake van (guard's van), is also used at the rear.

Revision as of 08:38, 25 January 2015

Highley - 43106 with down goods train in loop

A demonstration goods train is run during the Spring Gala and Autumn Gala and offers a rare opportunity to see, and hear, a train of loose coupled (ie. unbraked) wagons.
A variety of locos are used, with typically 12 to 18 wagons. As the wagons are mostly unbraked, a brake van (guard's van), is also used at the rear.