Difference between revisions of "December 9"

From SVR Wiki
Jump to: navigation, search
m
(Info added)
 
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*1931 BR brought a new 113 lever frame into use at [[Buildwas]] signal box in connection with the opening of [[Ironbridge power station]]<ref>[[Bibliography#Books|Mitchell and Smith (2007)]] fig. 96.</ref>.  
+
*[[List of signal boxes#Severn_Valley_Railway|1931]] GWR brought a new 113 lever frame into use at [[Buildwas]] signal box in connection with the opening of [[Ironbridge power station]].<ref>[[Bibliography#Books|Mitchell and Smith (2007)]] fig. 96.</ref>
 +
*1969 [[GWR 1116 Full Third]] arrived on the SVR, one of four vehicles from the Swindon test train purchased around that time.
 +
*1972 [[LMS 12992 Corridor Third]] arrived on the SVR from Plymouth.  
 
   
 
   
 
==See also==
 
==See also==

Latest revision as of 05:29, 25 November 2019

On December 9 in SVRSevern Valley Railway history.

See also

On this day in SVRSevern Valley Railway history

← December 8 - December 10 →

References

  1. Mitchell and Smith (2007) fig. 96.