Difference between revisions of "December 16"

From SVR Wiki
Jump to: navigation, search
(Created page with "On {{PAGENAME}} in SVR history. * 1972 Part of the water tank at Llangollen was lowered to the ground and loaded for transp...")
 
m
Line 1: Line 1:
 
On {{PAGENAME}} in SVR history.
 
On {{PAGENAME}} in SVR history.
  
*[[Severn Valley Railway Timeline 1970-1979#1972 | 1972]] Part of the water tank at Llangollen was lowered to the ground and loaded for transportation to the SVR on the following day. The other half followed in the New Year.
+
*[[Severn Valley Railway Timeline 1970-1979#1972 | 1972]] Part of the water tank at Llangollen was lowered to the ground and loaded for transportation to the SVR on the following day. The other half followed in the New Year<ref>SVR News 109</ref>.
  
 
==See also==
 
==See also==

Revision as of 15:20, 10 December 2018

On December 16 in SVRSevern Valley Railway history.

  • 1972 Part of the water tank at Llangollen was lowered to the ground and loaded for transportation to the SVRSevern Valley Railway on the following day. The other half followed in the New Year[1].

See also

On this day in SVRSevern Valley Railway history

← December 15 - December 17 →

References

  1. SVRSevern Valley Railway News 109