Coalport

From SVR Wiki
Revision as of 22:15, 14 May 2018 by Robin (talk | contribs)
Jump to: navigation, search
Postcard of Coalport circa 1900
A Northbound DMUDiesel Multiple Unit at Coalport in September 1962. The signal box can be seen in the far distance. (Sellick Collection)
82009 calls at Coalport on 25 July 1959
Next stations pre-closure
Towards Hartlebury and Kidderminster Towards Shrewsbury
Linley (2½ miles) Ironbridge (2 miles)
via Jackfield Halt (from 1934)

Coalport Station was located 25 miles from Hartlebury and 15¾ miles from Shrewsbury.

History

The station opened on 1 February 1862 with a single platform. On 28 February 1894, GWRGreat Western Railway General Manager Henry Lambert proposed that the station should become a crossing place with the addition of a second platform and additional sidings for Exley & Sons' traffic at a total cost of £4,062.[1] The signal box was a GWRGreat Western Railway Type 5 brick signal box with a 31 lever frame comprising 24 working levers and 7 spares. It was situated some way south of the station. The loop was the longest on the Severn Valley Branch with a length of 1,476ft,[1] and for that reason a two-lever ground frame, locked from the signal box, worked the loop points and FPLFacing Point Lock, equipment that physically locks points so that they cannot move. at the north end of the station. Col. Yorke gave approval of the new works on behalf of the Board of Trade on 22 January 1896.[1]

On 27 May 1903, approval was given for an additional bedroom for the Stationmaster’s house at a cost of £84.[1]

The ground frame at the north end of the passing loop was removed and replaced by motorised points around 1930.[1]

The station closed to passengers from 9 September 1963. The signal box was closed on 2 December 1963 after through freight services ended. The station building is now a private house. In May 2017 it was offered for sale at a price of £950,000.[2]

Coalport passing loop operating instructions

The BR(W) Working Timetables for 1948 and 1959 include the following operating instruction specific to Coalport: When a Freight Train is standing in either of the sidings on the UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR) Side at Coalport, waiting for a train to pass, the Guard must divide his train to provide space for the Signalman to pass through for the purpose of exchanging train staffs with the passing train.


Traffic statistics

GWR Traffic statistics for Coalport, selected years prior to 1939[3]
Passenger Traffic Freight Traffic
Year Tickets issued Parcels despatched Revenue (£) Tons received & despatched Revenue (£) Total revenue (£)
1903 7,906 1,325 493 11,021 3,820 4,313
1913 6,622 1,257 490 6,823 1,850 2,340
1923 8,984 1,885 754 9,253 3,857 4,611
1933 5,771 690 412 5,950 2,750 3,162
1938 5,741 1,257 366 4,937 1,771 2,137


Gallery

See also

The Severn Valley Railway under GWR/BR ownership

References

The Severn Valley Railway, John Marshall
Severn Valley Railway, A View from the Past, MA Vanns

  1. 1.0 1.1 1.2 1.3 1.4 Marshall (1989) p. 108.
  2. Rightmove.co.uk retrieved 1 August 2017
  3. Nabarro (1971) p. 55.