Bridgnorth Bypass Bridge seen from the Bypass
Fund raising poster from 1974

Bridge 35, Bridgnorth Bypass Bridge was built during the winter of 1982-83 as part of the construction of the Bridgnorth bypass. The proposed bypass always been a source of concern to SVR, as its construction would remove the embankment south of Bridgnorth Station, severing it from the rest of the line.

Contents

History

Shropshire County Council had first announced plans for a bypass at Bridgnorth in around 1937, although by the 1960s no decision had been reached. In response to BR’s application on 1 February 1968 for the first Light Railway Order, the Council objected on the grounds that it would add a further £60,000 to the cost of the bypass, were they to build it (for context, the SVR were negotiating with BR to but the first section of the line for £25,000 at the time). As the result of pressure from the Minister of Transport in June 1969, the Severn Valley Railway Company was advised to enter into an agreement with Shropshire County Council so that if and when the proposed bypass was authorised by the Department of the Environment, the SVR would dedicate the necessary land required by the Council to build the road, and thus sever the permanent way south of Bridgnorth. The SVR would then have to build, at its own expense, a very substantial bridge to maintain the rail link to Bridgnorth. The Agreement was dated 25 February 1970,[1] following which the SVR opened in May 1970.

The prospectus for the floatation of SVR(H) issued on 11 April 1972 proposed a further issue of shares to fund the bypass bridge, "provided that these proposals were not impracticable, i.e. not too expensive". However by late 1972, with the bypass becoming a realistic prospect, concerns were mounting that Sir Gerald Nabarro could use this as a reason to abandon Bridgnorth. At the Guarantee Company Annual General Meeting on 3 November 1972, a resolution was unanimously passed that no final decision should be made on the provision of the bypass bridge without the prior approval of the Guarantee Company (as holder of 26 per cent of the issued share capital of the Holdings Company, which owned the line and which would have to raise the money to build a bridge over the new bypass).

The Compulsory Purchase Order procedure commenced on 7 April 1973.[2] An EGM of the Guarantee Company was duly held on 18 May 1973, with around 300 members who attended being asked if the Company should raise the money to build the bridge or abandon Bridgnorth. The decision was taken, with only one vote against, to build the bridge.[3]

From reopening of the SVR in 1970, a proportion of fare revenue had been set aside in a dedicated trust fund to pay for the construction of this bridge.[4] Further fund raising initiatives began following the EGM, while in 1974 an SVRA raffle raised around £800 nett.[5]

After some considerable delay, the SVR was informed by the County Council in early 1982 that the bypass was 'all systems go' and that the SVR would be required to fulfil their part of the Agreement and build the necessary bridge to carry the line over it. However an amicable agreement was reached between the SVR and Shropshire County Council, with the Council agreeing to make a substantial contribution towards the cost of the bridge[6].

Construction

For the construction of the bridge, the SVR acted as the agent of the County Council. Consulting Civil Engineers, Edwards and Blackie, were responsible for the design of the bridge and a local firm of contractors, Jeavons, were appointed to carry out the actual construction of all but the steelwork. The fabrication of the steelwork was by Rubery Owen Steelwork. The bridge consists of two steel girders 76ft in length resting on concrete abutments, carried in turn on piles driven deep into the sandstone bedrock. The bridge has a concrete deck, cast in situ, rather than the normal longitudinal timbers used elsewhere on the line, allowing the track to be sleepered as normal on a ballasted base.

Preparatory work was carried out in autumn 1982, with the track being lifted on the morning of 1 November and excavation beginning the same day.[6] By Christmas, the concrete abutments and anchor blocks were completed and the embankments back-filled around them. The steelwork was delivered in the first week of 1983 and installed during January. The concrete pour took place on 9 February, with track being re-laid on 27 February. The first vehicle over the bridge was the 6-ton steam crane, while the following day 43106, 80079 and 4930 returned from main line duties at Hereford and became the first steam locomotives to cross the new bridge.[7]

The bridge was completed in time for the line to re-open for the 1983 season. However construction of the bypass required lowering the B4555 Highley road to pass underneath it, and consequently increasing the height of the railway embankment. Less than two months later, the embankment collapsed a few yards beyond the bridge (the area on the left of the photo below). Shropshire County Council and the SVR worked jointly for 14 hours a day seven days a week to reopen the line three weeks later.

Overhauls

Maintenance and repainting of the bridge was planned for, but deferred following the severe 2007 Storm Damage to the line. It was mechanically prepared and repainted using a moss green high specification paint, with a contribution of £30,000 in 2017 from Severn Valley Railway Charitable Trust Ltd.[8] It displays the SVR logo.

See also

References

  1. SVR News 13, July 1969, pp. 7-8, SVR News 19 Spring 1970, p. 4.
  2. SVR News 28, Summer 1973
  3. SVR News 26, 27, 28
  4. Terms and conditions on 1970 ticket reproduced in Severn Valley Steam, G. Nabarro (1971)
  5. SVR News 32
  6. 6.0 6.1 SVR News 66
  7. SVR News 67
  8. SVR Charitable Trust Report and Financial Statements 30 June 2017

Links

SVR Wiki

Main Page

From SVR Wiki
Jump to: navigation, search

Welcome to the Severn Valley Railway Wiki

From this week's featured article
"76738" is a London and North Western Railway Company 10-ton Goods Van, although it carries a fictitious number as its true identity is unknown. After restoration it saw limited use in the SVRSevern Valley Railway's demonstration goods train, but due to its age and wooden underframe it is now in static use as a sales coach at Bridgnorth. (Full article...)
Schematic Map of the SVRSevern Valley Railway
BridgnorthEardingtonHampton LoadeCountry Park HaltHighleyThe Engine HouseArleyVictoria BridgeNorthwood HaltWyre Forest LineBewdleyStourport BranchBewdley TunnelConnection to Network RailKidderminsterMaps#Schematic maps of the pre-closure SVRMapandlinks.png
Click on the map for a
larger interactive version

For 101 years between 1862 and 1963, the Severn Valley Railway formed part of the national railway network, running for 40 miles between Hartlebury and Shrewsbury. Established as a separate company, it was mainly operated by the Great Western Railway (GWRGreat Western Railway) and later by British Railways (BRBritish Rail or British Railways).

The present day Severn Valley Railway (SVRSevern Valley Railway) was established in 1965 to preserve part of the line as a heritage railway. Today it has six stations and two halts and runs for 16 miles along the Severn Valley between Bridgnorth in Shropshire and Kidderminster in Worcestershire, following the course of the River Severn for much of its route. Operations involve a mixture of steam and heritage diesel-hauled services.

This unofficial website is a project aimed to collect information and record events relating to the SVRSevern Valley Railway, both past and present.

For timetables, fare information, and news about special events, please visit the SVR Official Website. Other news and information of interest to members, shareholders and enthusiasts can be found on SVRLive.

In April 2023 the SVRSevern Valley Railway announced the launch of a Survival Fund to enable it to overcome the current financial crisis and implement longer-term plans for its future. Information and details of how to donate may be found on the SVRSevern Valley Railway's Survival Fund page.

Categories of article

History of the Severn Valley Railway

Current events on the SVRSevern Valley Railway

Information about the SVRSevern Valley Railway

Miscellaneous


Query Corner

Unsurprisingly, there are a large number of questions about the SVRSevern Valley Railway, both in pre-preservation days and for a number of historical items since then. Take a visit down to Query Corner to see if you have a recollection relating to some long forgotten event, or know of a reliable source (maybe an early edition of the SVR News?) that might have the information we need!

Adding to this Wiki

This site, or "wiki", is a collaborative effort, and anyone who has any knowledge relating to the SVRSevern Valley Railway should feel free to contribute. Once you have created a user account and logged in, you can modify any page by clicking the "Edit" button in the top right hand corner. For some tips on how to format pages, and some guidelines on how to make this wiki accessible can be found on Tips for contributing to the SVR Wiki.

Alternatively, if you don't feel confident editing this Wiki (although there is no reason you shouldn't!!), each article also has a "Discussion" page, which can be accessed by clicking the relevant button in the top left hand corner. This allows you to make additions, suggestions, or corrections to a page without making any change to the article itself.


Navigation menu