Difference between revisions of "Bewdley Tunnel"

From SVR Wiki
Jump to: navigation, search
Line 1: Line 1:
Bewdley tunnel is 480 yards long. Its small bore is attributable to it being relined in 1908. http://www.bewdleystation.co.uk/History4.html
+
Bewdley tunnel is 480 yards long situated on the [[Acceptance Lever]] worked single line section between [[Kidderminster]] and [[Bewdley]]. Its small bore is attributable to it being relined in 1908. http://www.bewdleystation.co.uk/History4.html

Revision as of 12:39, 24 January 2015

Bewdley tunnel is 480 yards long situated on the Acceptance Lever worked single line section between Kidderminster and Bewdley. Its small bore is attributable to it being relined in 1908. http://www.bewdleystation.co.uk/History4.html