Changes

Jump to: navigation, search

Bewdley Down Yard

4 bytes added, 08:20, 29 June 2020
m
Link added
There are plans to amend the track layout to eliminate the reverse move from the goods shed to access the paint shop, and instead to feed it from the back road and install a second track. It is hoped to re-clad the existing shop and have a second shed over a second track.<ref>Haynes, M., Bewdley Carriage Notes, SVR News No. 199 Autumn 2017, 39</ref>
In 1978, SVR volunteers, working with the [[Manpower Services Commission]], dismantled and removed a traverser from Swindon Works. This was then stored at [[Eardington]] to be used as part of a planned expansion of the carriage works at Bewdley. The plans were abandoned when the much larger [[Carriage Repair Works | goods shed at Kidderminster]] became available in 1985, and the traverser was scrapped.
== Gallery ==
Trustworthy, administrator
6,622
edits

Navigation menu