Changes

Jump to: navigation, search

BR 16169 Composite Corridor

48 bytes added, 01:11, 13 September 2019
m
Details added
===Overhaul from 2013===
By 2013 work had started, as it was reported as undergoing a light repair.<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=2738&highlight=16169 GM's monthly round up March 2013]</ref> It was however photographed in July 2015 stored in [[Kidderminster Carriage Shed|the carriage shed]] awaiting further work. It had developed into a heavy overhaul by 2017, albeit as events permitted.<ref>SVR News 200, Winter 2017</ref> In March 2017 16169 was moved outside [[Carriage Repair Works|Kidderminster Carriage Works]], initially for welding repairs, and Spring 2018 saw it outside the [[Carriage Repair Works|Kidderminster paintshop]] after work to make it waterproof with a newly painted roof.<ref>[https://forum.svr-online.org.uk/viewtopic.php?t=3461 SVR Forum, 19 April 2018)</ref> In May September 2019 it still resided there, awaiting its turnwas in the paint shop receiving further repairs before proper painting can begin.
==See also==
Trustworthy, administrator
6,533
edits

Navigation menu