Difference between revisions of "Arley signal box"

From SVR Wiki
Jump to: navigation, search
(Added History section with description of pre-preservation diagram)
(Added "operational features" section; added text to description)
Line 1: Line 1:
A signal box situated at [[Arley]] station, working to [[Bewdley North signal box|Bewdley North]] and [[Highley signal box|Highley]].
+
A signal box situated at [[Arley]] station, working to [[Bewdley North signal box|Bewdley North]] and [[Highley signal box|Highley]] using ETT regulations in both directions.  It can be switched out if trains are not required to cross.
  
 
== Diagram ==
 
== Diagram ==
  
 
[[File:Arley box diagram.gif|400px]]
 
[[File:Arley box diagram.gif|400px]]
 +
 +
== Operational Features ==
 +
 +
Arley is one of two signal boxes on the SVR that can be switched out, the other being [[Hampton Loade signal box|Hampton Loade]].  When the box is switched out the Down Loop cannot be used.
 +
 +
Unusually, when the box is switched out the yard can still be accessed, by operating the signal box lever frame as a ground frame.  An intermediate token instrument is provided to enable trains to be locked into the yard.  One side effect of this operation is that whilst the yard is being shunted, the Highley and Bewdley North signalmen are unable to communicate by bell signal.
  
 
== History ==
 
== History ==

Revision as of 22:17, 10 January 2015

A signal box situated at Arley station, working to Bewdley North and Highley using ETTElectric Train Token regulations in both directions. It can be switched out if trains are not required to cross.

Diagram

Arley box diagram.gif

Operational Features

Arley is one of two signal boxes on the SVRSevern Valley Railway that can be switched out, the other being Hampton Loade. When the box is switched out the DownIn reference to the direction of travel means away from the major terminus (i.e. towards Bridgnorth on the present day SVR) Loop cannot be used.

Unusually, when the box is switched out the yard can still be accessed, by operating the signal box lever frame as a ground frame. An intermediate token instrument is provided to enable trains to be locked into the yard. One side effect of this operation is that whilst the yard is being shunted, the Highley and Bewdley North signalmen are unable to communicate by bell signal.

History

Before preservation, the signal box had a 14-lever frame with no switching out facility. Other minor changes include two stacked disc signals at the toe of the yard points as per normal GWRGreat Western Railway practice, and a bracket for entry to the yard at the up home signal. A diagram is available on the signalbox.org website.

See Also