Difference between revisions of "April 4"

From SVR Wiki
Jump to: navigation, search
(Bridgnorth Refreshment Room event)
(Details added)
 
Line 2: Line 2:
  
 
*[[Severn Valley Railway Timeline 1990-1999#1996|1996]] [[Country Park Halt]] opened<ref>SVR News 119</ref>.
 
*[[Severn Valley Railway Timeline 1990-1999#1996|1996]] [[Country Park Halt]] opened<ref>SVR News 119</ref>.
 +
*2006 [[Colin Binch]] commenced work with the SVR for familiarisation prior to assuming the role of [[The Severn Valley Railway in preservation#General_Manager|SVR General Manager]],
 
*2019 The SVR staged a special event to celebrate the opening of the [[Bridgnorth#Bridgnorth Development Project|new refreshment room at Bridgnorth]], attended by around 650 shareholders who had invested in the [[Severn Valley Railway (Holdings) PLC#Share_offers|2017 share offer]]. The SVR ran a number of special trains between Kidderminster and Bridgnorth for the event.  
 
*2019 The SVR staged a special event to celebrate the opening of the [[Bridgnorth#Bridgnorth Development Project|new refreshment room at Bridgnorth]], attended by around 650 shareholders who had invested in the [[Severn Valley Railway (Holdings) PLC#Share_offers|2017 share offer]]. The SVR ran a number of special trains between Kidderminster and Bridgnorth for the event.  
 +
*2020 The intended reopening date of the whole line after repairs to [[Falling Sands Viaduct]], it was was overtaken by the total closure from the previous month due to the [[2020 coronavirus disease (COVID-19) pandemic|coronavirus (COVID-19) pandemic]].
  
 
==Gallery==
 
==Gallery==

Latest revision as of 13:02, 21 March 2020

Country Park Halt seen from the adjacent foot crossing
On April 4 in SVRSevern Valley RailwaySVRA:Severn Valley Railway AssociationSVRS:Severn Valley Railway Society history.
  • 1996 Country Park Halt opened[1].
  • 2006 Colin Binch commenced work with the SVRSevern Valley RailwaySVRA:Severn Valley Railway AssociationSVRS:Severn Valley Railway Society for familiarisation prior to assuming the role of SVR General Manager,
  • 2019 The SVRSevern Valley RailwaySVRA:Severn Valley Railway AssociationSVRS:Severn Valley Railway Society staged a special event to celebrate the opening of the new refreshment room at Bridgnorth, attended by around 650 shareholders who had invested in the 2017 share offer. The SVRSevern Valley RailwaySVRA:Severn Valley Railway AssociationSVRS:Severn Valley Railway Society ran a number of special trains between Kidderminster and Bridgnorth for the event.
  • 2020 The intended reopening date of the whole line after repairs to Falling Sands Viaduct, it was was overtaken by the total closure from the previous month due to the coronavirus (COVID-19) pandemic.

Gallery

Photos taken on 4 April:

References

  1. SVRSevern Valley RailwaySVRA:Severn Valley Railway AssociationSVRS:Severn Valley Railway Society News 119

See also

On this day in SVRSevern Valley RailwaySVRA:Severn Valley Railway AssociationSVRS:Severn Valley Railway Society history

← April 3 - April 5 →