Difference between revisions of "April 20"
From SVR Wiki
(Info added) |
|||
Line 2: | Line 2: | ||
*1861 The roof was completed on [[Stourport |Stourport station]]; the goods shed and a cottage for the crossing keeper were also complete by this date.<ref>[[Bibliography#Books|DJ Smith (1968)]] p. 16.</ref> | *1861 The roof was completed on [[Stourport |Stourport station]]; the goods shed and a cottage for the crossing keeper were also complete by this date.<ref>[[Bibliography#Books|DJ Smith (1968)]] p. 16.</ref> | ||
− | *2000 Shunter [[12099]] propelled the first rake of carriages into the newly completed [[Kidderminster Carriage Shed]]<ref>SVR News 133</ref>. | + | *2000 Shunter [[12099]] propelled the first rake of carriages into the newly completed [[Kidderminster Carriage Shed]].<ref>SVR News 133</ref> |
+ | *2016 The SVR featured in an edition of BBC Radio 4's Money Box programme, in an item 'How to Have a Fabulous Wedding on a Budget'<ref>Express Points Web Round Up, May 2016</ref>. | ||
==See also== | ==See also== |
Revision as of 15:10, 17 March 2020
On April 20 in SVRSevern Valley Railway history.- 1861 The roof was completed on Stourport station; the goods shed and a cottage for the crossing keeper were also complete by this date.[1]
- 2000 Shunter 12099 propelled the first rake of carriages into the newly completed Kidderminster Carriage Shed.[2]
- 2016 The SVRSevern Valley Railway featured in an edition of BBC Radio 4's Money Box programme, in an item 'How to Have a Fabulous Wedding on a Budget'[3].
See also
On this day in SVRSevern Valley Railway history
References
- ↑ DJ Smith (1968) p. 16.
- ↑ SVRSevern Valley Railway News 133
- ↑ Express Points Web Round UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR), May 2016