Difference between revisions of "April 20"

From SVR Wiki
Jump to: navigation, search
(Info added)
Line 2: Line 2:
  
 
*1861 The roof was completed on [[Stourport |Stourport station]]; the goods shed and a cottage for the crossing keeper were also complete by this date.<ref>[[Bibliography#Books|DJ Smith (1968)]] p. 16.</ref>
 
*1861 The roof was completed on [[Stourport |Stourport station]]; the goods shed and a cottage for the crossing keeper were also complete by this date.<ref>[[Bibliography#Books|DJ Smith (1968)]] p. 16.</ref>
*2000 Shunter [[12099]] propelled the first rake of carriages into the newly completed [[Kidderminster Carriage Shed]]<ref>SVR News 133</ref>.
+
*2000 Shunter [[12099]] propelled the first rake of carriages into the newly completed [[Kidderminster Carriage Shed]].<ref>SVR News 133</ref>
 +
*2016 The SVR featured in an edition of BBC Radio 4's Money Box programme, in an item 'How to Have a Fabulous Wedding on a Budget'<ref>Express Points Web Round Up, May 2016</ref>.  
  
 
==See also==
 
==See also==

Revision as of 15:10, 17 March 2020

Stourport Station in 1910
On April 20 in SVRSevern Valley Railway history.
  • 1861 The roof was completed on Stourport station; the goods shed and a cottage for the crossing keeper were also complete by this date.[1]
  • 2000 Shunter 12099 propelled the first rake of carriages into the newly completed Kidderminster Carriage Shed.[2]
  • 2016 The SVRSevern Valley Railway featured in an edition of BBC Radio 4's Money Box programme, in an item 'How to Have a Fabulous Wedding on a Budget'[3].

See also

On this day in SVRSevern Valley Railway history

← April 19 - April 21 →

References

  1. DJ Smith (1968) p. 16.
  2. SVRSevern Valley Railway News 133
  3. Express Points Web Round UpIn reference to the direction of travel means towards the major terminus (i.e. towards Kidderminster on the present day SVR), May 2016