Difference between revisions of "Absolute Block"
From SVR Wiki
(Clarified which lines AB applies to) |
|||
Line 1: | Line 1: | ||
− | A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVR controlled this way is | + | A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVR controlled this way is the main lines between [[Bewdley North signal box|Bewdley North]] and [[Bewdley South signal box|Bewdley South]] signal boxes. |
Revision as of 09:39, 25 January 2015
A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVRSevern Valley Railway controlled this way is the main lines between Bewdley North and Bewdley South signal boxes.