Difference between revisions of "Absolute Block"

From SVR Wiki
Jump to: navigation, search
(Created page with "A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVR controlled this way is that between Bewdley Nor...")
 
Line 1: Line 1:
A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVR controlled this way is that between [[Bewdley North]] and [[Bewdley South]] signal boxes.
+
A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVR controlled this way is that between [[Bewdley North signal box|Bewdley North]] and [[Bewdley South signal box|Bewdley South]] signal boxes.

Revision as of 11:56, 24 January 2015

A method of signalling for controlling the passage of trains over a double track railway. The only section of the current SVRSevern Valley Railway controlled this way is that between Bewdley North and Bewdley South signal boxes.