Stourport Branch

Revision as of 09:17, 21 January 2015 by Boldford (talk | contribs)

The short length of remaining track is now used as a siding. This line was the original connection of the Severn Valley line to the main at Hartlebury. There was an intermediate halt on the branch, just beyond the tunnel at Burlish.