Changes

Folly Point Siding

88 bytes added, 15:24, 30 November 2018
add photo
[[File:GWRplanFollyPoint.jpg|thumb|300px|right|Map showing the location of the siding]]
Folly Point siding was installed by the GWR for the use of contractors building the [[Elan Valley Aqueduct]]. It was situated to the west of the line and was controlled by two ground frames of two levers each, locked by a key on the electric train staff for the section.<ref name=JM>[[Bibliography#Books|Marshall (1989)]] p. 95.</ref>